Mountain Grout Flexible and Mountain Grout Soil Stabilizer were the materials
chosen for two projects in the state of Florida. (The photographs featured here are from
the project at the Kennedy Space Center.) The C-51 canal restoration was performed for
South Florida Water Management, supervised by the U.S. Army Corps of Engineers.
Tidal action along with failed joints was causing the loss of soils, creating sink holes. The
application involved injecting Mountain Grout Flexible into the ground at each joint
along the seawall to seal the joint. Approximately one mile of seawall was repaired. Hangar AF at the Kennedy Space Center was the site of another successful application
using a combination of polyurethane products supplied by Green Mountain, LLC.
Mountain Grout Flexible was used in the seawall joints and Mountain Grout Soil
Stabilizer was used behind the wall to form a curtain (barrier) of solidified soil. Mountain
Grout Soil Stabilizer when injected into loose soils, creates a dense mass. Very high
compressive strengths may be achieved, resulting in grout curtain impervious to water.
These repair procedures are viable alternatives to replacing seawalls or excavating behind |